64 New Vacancies at JVACEE (Julius Nyerere Hydropower Project), May 2022

64 New Vacancies at JVACEE (Julius Nyerere Hydropower Project), May 2022

JVACEE is a joint venture company of Arab contractor and El-sewedy Electric, dealing with the scope of Engineering, Procurement and Construction of Julius Nyerere Hydropower Project in Stigler’s Gorge in Tanzania.

Majina Ajira za Sensa Jiunge hapa

It is expected to produce 2,115 MW of installed Capacity. On the waters of the Rufiji river, in joint venture with The Arab Contractors of Egypt (Osman A. Osman & Co.), ELSEWEDY ELECTRIC is entrusted by the people and government of Tanzania to execute, The Julius Nyerere Hydropower Project. This national mega project that would secure clean power supply to more than 60 million Tanzanians.

Available Vacancies

We are looking for the below mentioned positions to be filled immediately. View full details from the PDF Document attached below:

Recommended
1 of 10

J-V-A-C-E-E, Julius Nyerere Hydro Power Project (JNHPP) is Urgently Looking for
the Following Candidates to fill the available below Positions :-
1) Motor Grader Operator —- 22 positions
2) Excavator Operator ——– 26 Positions
3) Soil Compactor Operator — 10 Positions
4) Soil Reclaimer Operator —- 06 Positions

Majina Ajira za Sensa Jiunge hapa

Qualifications:

The Ideal candidate should posses a working experience of not less than 3 Years.

MODE OF APPLICATION/ How to Apply for 64 New Vacancies at JVACEE 

Interested candidates should send their up to date CV’s and ID (National, Voter’s ID or Driving License) to jobs@jvacee.com and Visit our nearest representative offices of Kisaki Morogoro, or Mloka Rufiji, Pwani. Deadline is 20th May 2022. Interviews and work station will be at Julius Nyerere Hydropower Project (JNHPP). These positions are open for Tanzanian Locals only.

Leave a comment